What can fit this scope
- Wooden playsets and clubhouse towers
- Round, square, and rectangular trampolines
- Slides, ladders, nets, swings, and loose accessories
- Surface hardware and teardown debris included in the agreed scope
How the work is planned
The first review identifies the equipment, connections, anchors, nearby surfaces, and route to the loading point. The approved scope should state whether posts, concrete, borders, ground cover, and loose debris are included.
Estimate factors commonly include overall size, construction material, deterioration, disassembly time, carry distance, gate width, stairs or slopes, parking, and the volume and weight of material.
Prepare the yard
- Keep children and pets away from the work area.
- Point out buried irrigation, lighting, or electrical lines.
- Unlock gates and move vehicles away from the loading path.
- Tell the crew about concrete-set posts or hidden anchors.
Common questions
Does everything need to be dismantled before pickup?
No. The photos and estimate should establish whether controlled disassembly is part of the agreed job.
Are concrete footings always included?
No. Footing depth, access, utilities, and the desired finish must be reviewed separately.
Can materials be donated or recycled?
That depends on condition, completeness, local acceptance rules, and available outlets. No destination should be promised before it is confirmed.

